100A to 200A upgrades - ESA permit included

Limited Time Only

Top Rated
Service 2026
Google
Google star 1Google star 2Google star 3Google star 4Google star 5
5.0
verified by Trustindex
Trustindex verifies that the company has a review score above 4.5, based on reviews collected on Google over the past 12 months, qualifying it to receive the Top Rated Certificate.

Free Surge Protector with Panel Upgrades

Trusted by property managers, commercial tenants & homeowners

Pioneer boxes, fuse panels, and maxed-out 100A services cap what your property can do – and put it at risk while they do it. We size the service to your real load and install it once.

Request Pricing

Get expert advice, a straight recommendation, and a written price once we’ve seen the job.

Service Required
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Our Process

How a Panel Upgrade Actually Goes

A service upgrade touches your meter, your utility feed, and every circuit in the building. We plan it so you know the scope, the cost, and the day you’ll be without power – before we start.

Step 01

Inquiry

Tell us what’s tripping or what you’re adding. We book an on-site panel assessment, not a phone estimate.

Step 02

Site Review

We open the panel, check service size, grounding, bonding, and breaker condition, then run a real load calculation on what you have and what’s coming.

Step 03

Quote & Scope

You receive a written scope: service size, panel make, circuit count, ESA permit, utility coordination, and exactly what gets opened. One number, no hidden costs.

Step 04

Execution & Sign-off

We pull the ESA permit, coordinate the disconnect, install and label every circuit, and stay on it until the inspection passes and your Certificate of Acceptance is issued.

Load-calculated, permitted, inspected

The Panel Sized for the Next 20 Years - Not Just Today

Plenty of electricians will swap your panel for whatever fits the price. We size the service to your actual demand, plus the EV charger, heat pump, or basement suite you haven’t installed yet. Do it once.

Consultation Services

Installation Services

Post-Installation Services

Toronto's

Top Rated Electrical, Panel Upgrade Company

Federal Pioneer boxes, fuse panels, and maxed-out 100A services quietly cap what your property can do – and put it at risk while they do it. We size the service to your real load, pull the ESA permit, coordinate the utility, and install it once. Licensed master electrician, 15 years in Ontario panels.

Top Rated
Service 2026
Google
Google star 1Google star 2Google star 3Google star 4Google star 5
5.0
verified by Trustindex
Trustindex verifies that the company has a review score above 4.5, based on reviews collected on Google over the past 12 months, qualifying it to receive the Top Rated Certificate.

Andrew Spano

Master Electrician & Founder

POWERING YOUR VISION

Panel & Service Upgrades Across the GTA

Whether it’s a 60A fuse box in a century home, a Federal Pioneer panel your insurer has flagged, or a 100A service that can’t take one more circuit – we replace it with a code-compliant service built for what you’re actually running.

Panel Replacements & Service Upgrades

Fuse boxes, Federal Pioneer Stab-Lok panels, and undersized 100A services are the three things we get called about most. Replacing them ends nuisance trips, clears insurance flags, and gives you the headroom to renovate.

Commercial Service & Distribution Upgrades

When a building’s service is maxed out, you can’t add tenants, equipment, or hours. We increase capacity without keeping you dark longer than we have to.

What a 200A Service Unlocks

A service upgrade is rarely the goal – it’s what stands between you and the rest of the project. Once the capacity is there, everything after it gets simple.

A Trusted Voice in Electrical Safety

ECRA Advisory Council Member

I’m proud to serve as a member of the ECRA Advisory Council, nominated by the Electrical Safety Authority and the ECRA Advisory Council board members. I work alongside the board to bring forward ideas and improvements that strengthen electrical safety across Ontario, while representing the perspectives of both customers and contractors throughout the province. It’s a responsibility I take seriously – and one that reflects the same commitment to safety, quality, and accountability we bring to every project and one that reflects the same commitment to safety, quality, and accountability we bring to every project. That’s the standard behind every service we size, every permit we pull, and every panel we sign off on..

The cheapest time to add surge protection

Surge Protection At Your New Panel

"One power surge can destroy $10k+ worth of electronics."

The panel is already open and the labour is already on site – installing whole-building surge protection during an upgrade costs a fraction of doing it as its own visit. Most electricians never bring it up. We do, every time.

*Included with every panel or service upgrade. Protects your appliances and electronics from power surges.

Everything your panel is holding back

The Phaze-In Difference

A service upgrade is one of the few electrical jobs where a lower price changes what you actually receive. Permit or no permit. Load calculation or a guess. A licensed contractor with an ESA licence number and insurance, or someone who is unreachable the week after the cheque clears.

Your Problem

Electrical problems are expensive when handled by unlicensed workers. Poor wiring causes equipment failure, outages, and safety hazards. A licensed electrical contractor prevents risk, downtime, and insurance complications. 

Breakers trip under normal load. There’s no space left for the EV charger or the renovation. Or your insurance company has named a Federal Pioneer or fuse panel & asked you to deal with it before renewal.

A service upgrade without an ESA permit means no inspection and no Certificate of Acceptance – which becomes a very hard conversation at resale or at claim time. Undersized service, weak bonding, and mismatched breakers don’t announce themselves until they fail.

You’ve been told 100A is fine, that 200A is overkill, and the quotes range by thousands. Without a load calculation, all of that is guesswork with a number attached.

Our Solution

Phaze-In sizes your service with a real load calculation, quotes it in writing, pulls the ESA permit, coordinates the utility, and doesn’t leave until the inspection passes. Fifteen years, one licensed master electrician, fully insured.

We calculate your existing demand plus the loads you’re planning, then specify the service and panel that carries both – with room left over instead of a panel that’s full on day one.

We pull the permit, meet the inspector, and hand you the Certificate of Acceptance – the document that protects your insurance coverage and your resale.

Utility coordination booked in advance, the power-off window planned rather than open-ended, and a labeled panel schedule anyone can follow.

Sized right, permitted, inspected

Built To Carry What Comes Next

You get a service that’s documented, inspected, and honest about its capacity – not shortcuts. Phaze-In Electric is led by a licensed electrical contractor with 15 years of experience. We don’t compete with unpermitted panel swaps. Our job is to make sure the last thing limiting your property is its electrical service.

Faq’s

Panel & Service Upgrade Questions

Straight answers on sizing, permits, downtime, and cost. If your situation isn’t covered here, send us your panel details and we’ll tell you what you’re looking at.

It depends on your real load. We calculate what you use now plus what you’re adding – EV charger, heat pump, hot tub, basement suite. Most GTA homes adding two of those need 200A.

Always. A service upgrade legally requires one. You receive the Certificate of Acceptance once it passes inspection.

Typically most of one working day for a residential service upgrade. We book the utility disconnect in advance so the window is planned, not open-ended.

Yes – it’s one of the most common jobs we do. We replace it to current code and give you the ESA documentation your insurer is asking for.

We quote after the site review, based on service size, meter and service entrance condition, panel location, and circuit count. Not off a phone call.

We tell you before we start exactly what has to be opened. Most upgrades stay contained to the panel wall and the service entrance.

Yes, and it’s the cheapest time to do it. The panel is open and the labour is already on site.

A licensed master electrician – not subcontractors.

PANEL UPGRADE QUOTE

Let's find out what your service can actually carry

Tell us your panel size, what’s tripping, and what you’re planning to add. We’ll book an on-site assessment and come back with a written scope and a firm number.

Fill out the form below

Service Required
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Fully licensed Electrical Contractor

Panel Upgrades Across the GTA

FOLLOW US ONLINE

Panel Warning Signs

If you smell burning at the panel, see scorch marks on a breaker, or trip the same breaker repeatedly:

now accepting CREDIT & interac

Powered By

Copyright © 2026 Phaze-In Electric Ltd. ECRA/ESA LICENSE #7011126 – All Rights Reserved